Implementation of reliability centred maintenance in maintaining medical equipment in hospital

Siti Hajar Salim, and Saiful Amri Mazlan, and Siti Aisyah Salim, (2019) Implementation of reliability centred maintenance in maintaining medical equipment in hospital. Journal of Building Performance, 10 (2). pp. 76-84. ISSN 2180-2106

[img]
Preview
PDF
361kB

Official URL: http://spaj.ukm.my/jsb/index.php/jbp/issue/view/Sp...

Abstract

Maintenance services are performed to ensure the equipment is operating according to manufacturer standard and maintained at desired level of quality. The implementation of properly scheduled of maintenance services may prevent unexpected breakdown and disruption of operational in a hospital. However, in some cases, series of breakdown occurred with the maintenance services in-place. This raised the doubts on the reliability and effectiveness of the maintenance services that being exercised. In general, there are many types of maintenance services nonetheless which suit best for medical equipment need to be identified. This paper is to identify the right maintenance services for medical equipment in hospital using Reliability Centred Maintenance (RCM). The equipment was selected based on the criticality and the breakdown history. Failure factors of breakdown were identified and based on this data, a right maintenance services were recommended for the further action.

Item Type:Article
Keywords:Maintenance; Medical equipment; Reliability-centred maintenance
Journal:Journal of Building Performance
ID Code:13680
Deposited By: ms aida -
Deposited On:20 Nov 2019 06:30
Last Modified:22 Nov 2019 21:36

Repository Staff Only: item control page