Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine

Kumar, Pagare Ajay and Neeraj, Kumar (2022) Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine. Jurnal Kejuruteraan, 34 (4). pp. 585-589. ISSN 0128-0198

[img]
Preview
PDF
610kB

Official URL: https://www.ukm.my/jkukm/volume-3404-2022/

Abstract

The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journals. The study derives a further framework model comprising three strategies (Supply chain management, inventory management, and maintenance engineering) to improve rate of production. The aforesaid process is used to identify problems that occur during machine breakdown. The paper provides a research substitute machine to manage problems during breakdown of machines so that production is not hindered.

Item Type:Article
Keywords:Supply chain management; Inventory management; Maintenance engineering; Substitute machine; Shop floor flexibility
Journal:Jurnal Kejuruteraan
ID Code:20326
Deposited By: ms aida -
Deposited On:26 Oct 2022 03:07
Last Modified:02 Nov 2022 01:10

Repository Staff Only: item control page