Sample analysis of correlation of cost inputs of timber products in roof construction.

Ejiga .A.O, and Oyekunle .O.L, and Oke .A.A, (2011) Sample analysis of correlation of cost inputs of timber products in roof construction. Journal of Building Performance, 2 (1). pp. 2-8. ISSN 2180-2106

Full text not available from this repository.

Official URL: http://www.ukm.my/jsb/jbp/index.html

Abstract

Timber is widely used in the construction of buildings. It is a very visible component of roof structure and it forms the structure upon which the covering is laid. The cost of roofing is on the increase owing to the difficulties in sourcing timber in lumber forms nowadays. In Nigeria the construction of roof for residential buildings mostly in bungalows depend much on timber. A sample of thirty units of cost of timber roof structure from three (3) bedrooms flat under construction was collected from Contractors and Developers. Correlation was used to find out the cost input of timber in roof vs. the total cost of roof, the critical value of r =.195, cost input of roof in the total cost of building, r =.090, as well as cost input of timber in roof on the total cost of building, result shows r =-.063. Weak strength of relationship for the first two cases and negative was seen in the last case.

Item Type:Article
Keywords:Building; Construction; Cost; Roof; Timber.
Journal:Journal of Building Performance
ID Code:3522
Deposited By: Mr Azam
Deposited On:16 Feb 2012 01:12
Last Modified:25 Feb 2012 04:47

Repository Staff Only: item control page