Analysis of costs and prices of building rehabilitation work in federal university of technology, Minna, Nigeria using in-house consultants

Lawal .P.O, (2011) Analysis of costs and prices of building rehabilitation work in federal university of technology, Minna, Nigeria using in-house consultants. Journal of Building Performance, 2 (1). pp. 9-17. ISSN 2180-2106

Full text not available from this repository.

Official URL: http://www.ukm.my/jsb/jbp/index.html

Abstract

The paper is a detailed analysis of costs and prices of rehabilitation work carried out on some of the Federal University of Technology, Minna buildings on two of its campuses in the last quarter of 2006. Lecturers of the built-environment faculties were the supervising consultants. The aim was to verify the merits of using in-house consultants in place of the conventional ones. Method used in data collection was historical- collecting from the archives of the Task-force (consultants) and percentages was the analytical tool employed. Figures of savings made for the client by the consultants from both the pre-contract estimates and the various contractors’ variation claims were collated and analyzed. It was discovered that savings of between 9 and 43 percents were made on the cost of each of the contracts (lots), culminating in savings of about N9 million. The normal consultancy fee was waived for a flat-rate allowance The further patronage of this type of in-house consultants was recommended for tertiary institutions’ infrastructural facilities rehabilitation work.

Item Type:Article
Keywords:Facility; In-house; Professionals; Rehabilitation; Task-Force; Value-for-money.
Journal:Journal of Building Performance
ID Code:3523
Deposited By: Mr Azam
Deposited On:16 Feb 2012 01:23
Last Modified:25 Feb 2012 04:50

Repository Staff Only: item control page